This toe sleeve includes a sealed internal fluid chamber and integrated pressure disc, delaying the opening by either 30 minutes or 1 hour. The delay provides operational flexibility — allowing time for displacement, crew staging, or pressure stabilization before stage one begins. It’s ideal for wells requiring staggered starts or precise frac timing without intervention.
Time delay allows for prep or displacement.
Built-in internal chamber and disc system.